Back on the Sky at Gemini South

Nov. 2, 2015

After 18 days of hard work during the recent scheduled maintenance shutdown, the Gemini South telescope is back on the sky! During maintenance, which took place October 13th - 30th, the 8.1-meter primary mirror received a fresh multi-layer protected silver coating - a key task for the shutdown.

Image:
(Left)/strong> Gemini South optical engineers inspect the primary mirror after 7-hour coating process.
(Right) The 8.1 meter primary mirror suspended on the 4th floor, before descending to the stripping/coating area on the first floor of the observatory building.

source: 
PORTAL TO THE UNIVERSE